Product Details:
1.F2Pro, the maximum load is 11KW, and it can accommodate two S19-110T mining machines. The all-in-one machine has a fan water tank (Ships within 30 days)
Optional accessories: water pump, bedroom cooling fins, water heating and air conditioning, large swimming pool heating
2.A mining device is placed in a compact hermetic cell made of stainless material. The lid protects the equipment from moisture and dust intrusion. The heat from the equipment can be reused for house heating and other needs or simply utilized.
3.Offer: Order and purchase any product of GONBOX on LLGO, you can immediately get 1T BTC Hashrate (120days) as a gift.
For more product details, please click to view:https://www.gonbox.com/product/oil-cooled-f2-pro-integrated-version/
Upper water storage,middle heating and lower oil cooler.
80L stainless steel water tank, safe quick-connect chuck interface, equipped with water valve for easy installation and maintenance.
Driven by the high-efficiency oil pump and water pump, the flow rate of the coolant inside the all-in-one machine can reach 130L/MIN, and the rapid circulation can achieve high-efficiency heat exchange and heat dissipation.
The main cable of the whole machine adopts UL certified 6AWG cable, which can easily cope with the high load after overclocking. Chuck corrugated pipe is used for oil and water circuit of the whole machine,which is firm,durable and easy to maintain.
Product Parameters:
Oil Freezer Size | 600mm(L)*550mm(W)*1435mm(H) |
Oil Freezer Weight | 75KG |
Supported models | Full series of models of Ant and full series of models of Whatsminer |
Maximum load power | 11KW |
electrical access | single phase input200V-250V 50/60Hz |
Fuel consumption | 70L |
Circulating oil pump power | Three gears adjustable≤245W |
Circulating water pump power | Three gears adjustable≤245W |
Water/oil connection | 1 interface |
Coolant circulation volume | 40L/min |
Heat Exchanger | integrated |
water tank | integrated |
Internet connection | RJ45 interface |
contains components | Dry cooler,water storage tank,water pump,oil pump,heat exchanger |
other functions:
Overheat protection | Yes |
Overload protection | Yes |
Main equipment ground wire | Yes |
1. After placing an order, please remember to contact staff to determine the current product price. If the price is not confirmed with the staff, the payment slip is invalid;
2. Basic exchange policy: Except for the goods that are clearly marked on the product details page and confirmed at the time of purchase that "no reason to return or exchange is not supported". Products on the GONBOX column can apply for replacement under the premise that the products are in good condition, unused or damaged, and the accessories are complete. The GONBOX liquid-cooled mine box has a 3-month replacement period, and other commodity accessories have a 1-month replacement period (Note: You need to bear the replacement shipping fee yourself).